How Long Does a Corporate Website Take?

The honest answer depends on one thing: when the content is confirmed. With that on the table, a deadline can be signed. Here are ours and how the days are split.

By Axel Rodriguez · Estudio Furia · November 16, 2026

Hand-drawn website wireframe on paper
Photo: Compagnons · Unsplash

7 days

Corporate website

By contract · with content confirmed · Estudio Furia, November 2026

30 days

E-commerce, with products loaded

By contract · Estudio Furia, November 2026

20 days

Full design system redesign

By contract · Estudio Furia, November 2026

70+

Projects delivered

Estudio Furia · since 2010

The short answer

A corporate website ships in 7 days. An e-commerce site, with products loaded, in 30 days. A full design system redesign, in 20 days. Every deadline is written and signed before work starts.

The clock starts when the content is confirmed: copy, photos, logo and domain access. Without that, any deadline is an estimate. With it, it is a commitment.

What happens in those 7 days

Day 1: kickoff, content confirmed and site structure approved. Days 2 to 5: design and development on our own design system, no templates; each stage is approved before moving to the next.

Day 6: measurement. Google Analytics 4, Tag Manager and Search Console are connected before launch, so every form, WhatsApp click and email is recorded from the first visit. Day 7: final review on phone and desktop, and launch.

What really delays a website

In practice, design and code are rarely the bottleneck. What slows a project down is content that does not arrive, photos that need to be redone and decisions that pass through too many hands.

That is why the contract sets two things: the delivery deadline and the moment it starts to run. If content is late, the deadline moves with it, and that is stated in writing. It is more honest than promising a date nobody controls.

What a corporate website includes

Custom design for phone and desktop, service pages, cases or clients, a tracked contact form, technical SEO from the code and fast loading. And measurement: we do not deliver a site that cannot tell where each inquiry comes from.

What it does not include by default: photo production, writing all content from scratch and ad campaigns. They can be added, and when they are, the deadline is agreed separately.

E-commerce and redesign: why they take longer

An e-commerce site adds a catalog, payments, shipping and tracking of every purchase. The 30 days assume products are loaded or ready to import. A full design system redesign takes 20 days because what already ranks must be protected: URLs, titles and redirects.

The same rule applies to all three: a deadline by contract, with content confirmed.

Frequently asked questions

How long does a corporate website take?

At Estudio Furia, 7 days by contract, counted from the moment content is confirmed.

How long does an e-commerce site take?

30 days by contract, with products loaded or ready to import.

What if content is late?

The deadline starts when content is confirmed. It is written into the contract, for both parties.

Is the site delivered with measurement?

Yes. Google Analytics 4, Tag Manager and Search Console are connected before launch.

If your company is in the US, the service detail is at Web design and digital marketing agency for US businesses.

Source: delivery deadlines committed by contract by Estudio Furia, in force as of November 2026.

Step 1 / 4Estudio Furia

Contact

Tell us about your project

Answer a few quick questions and we'll guide you with a tailored proposal. Web projects from USD 1,000.

Book a meeting→30 minutes · online

Prefer to write directly? hey@estudiofuria.com · Reply within 24 h · Vendor kit for procurement